- Store
- Nintendo eShop
- Platform
- Nintendo Switch
- Release date
- 25 Jan 2019
- Developer
- Baltoro Games
- Publisher
- Baltoro Minis
- Players
- 2+
- Rating
- E
- Ways to play
- Meet up and play together, Play together on one console
- Play modes
- TV mode, Tabletop mode, Handheld mode
- Availability
- Available now
- Demo
- available
The newest Vs. Puzzle Game from Baltoro Games is coming to Nintendo Switch™!
We love the Nintendo Switch™. We love puzzle games. We love versus multiplayer modes!
WHAT IS FLOW LINES VS. ?
If you like classic puzzle video games for 1 or 2 players... we have a lot of stuff for you! Inspired by the very best in the genre, Flowlines Vs. aims at becoming one of the greatest party games out there. We want players to solve puzzles, to compete with others at it, and to play - everywhere and with everyone.
Pair up all the matching sockets on the board by drawing continuous lines, without crossing over other lines or branching off. Cover the entire board while connecting all sockets!
Watch out for time-limited stages, or for the limit on moves you can make per stage!
IN FLOWLINES VS. YOU WILL FIND:
• Over 400 levels you can play in, in single player mode or versus multiplayer mode!
• Atmospheric soundtrack emphasizing on the atmosphere of the game!
• 50+ amazing graphical themes!
• Awesome party atmosphere!
• Easy to play and hard to master.
• Both adults and children can pick up the game quickly, thanks to the Intuitive tutorial!
• Play any way you like - Joy-Con™, Pro Controller, using the touch screen or in handheld mode.
• Get your hands on special rewards available through our Achievement System.
• 8 supported languages... English, French, Spanish, Italian, German, Portuguese, Brazilian, Turkish... and even more coming soon.
Go ahead, try it out!
More from Baltoro Minis
Classic Games Collection Vol.1+2 Bundle$3.99
9 in 1 Sports Games Mega Collection$7.99
Classic Games Collection Vol.2$2.49 $2.99 -17%
Bowling Fever$9.99
Formula Racing Pro 2026$9.99
Pool Fever$4.99











